Battery-electric buses charged overnight at the depot or briefly along their routes.
Charging is planned around timetables, so buses start each day full and top up where they wait.
Planning chargers, grid connections and timetables around a battery-electric fleet.

Context
Moving a bus fleet to battery-electric changes how a depot works, from its power supply to daily timetables.
Step 0101
Assess the depot's grid connection and what upgrades it needs, which can take time to arrange.
Step 0202
Choose between depot and on-route charging, and lay out chargers around how buses move through the site.
Step 0303
Fit charging around timetables, routes and driver shifts, with headroom for cold days.
Considerations
Lead times for grid connection upgrades.
Range on long routes and in cold weather.
Training for drivers and maintenance staff.
How projects are sourced and reviewed is set out in our methodology.
Solutions and systems

Battery-electric buses charged overnight at the depot or briefly along their routes.
Charging is planned around timetables, so buses start each day full and top up where they wait.

System
Moving people and goods by road, rail, sea and air, from vehicle technology to the way cities are planned.
Road, aviation, shipping and mobility

System
How power is generated, moved and stored, and how grids adapt as more of the economy runs on electricity.
Electricity, renewables, grids and storage
Quick answers about the platform and its content.
The context, the work step by step, what it has to weigh up, and the solutions and systems it connects.
To show how approaches come together in practice across different systems, from restoring land to electrifying transport.
Every project links to the solutions it puts to use and the systems it touches, each with its own page.
Yes. Tell us about it through the contact page, and we can look at documenting it with its evidence.